Transformer Overcurrent Grading

© Copyright Rod Hughes Consulting Pty Ltd
Rod Hughes Consulting
General Web Site
 
Applications
Home
Innovations and
Solutions Home

A bit about
Rod Hughes
 Link to this page...

The URL in the browser address bar is volatile and may be broken at any time.

To obtain a link to this page, click the <<Share>> button top-right of the screen.

  

Note - if the navigation pane on the left of this window is not visible, click the 2-pane icon on the top bar



Overcurrent grading is generally a "straight forward" consideration of the maximum fault current of a downstream relay should result in a slower operation for the upstream relay.

However Delta-star transformers have a particular special consideration.

Consider a 11/11 kV  Dyn transformer (1:1 transformer for direct comparison HV to LV)

Assume 500 turns secondary on the phase-to-neutral winding.

LV volts per turn = (11000/√3) / 500 = 12.7 V/turn

On the HV delta side, there must be the equivalent V/turn = 12.7 V/turn, but the winding is connected phase-to-phase. 
Hence for a 1:1 transformer to achieve 11 kV at 12.7 V/turn, there must be 866 turns on the HV windings.

THV  = (√3 / 2) x  TLV = 0.866 TLV

Lets assume the maximum LV phase-earth fault IfmaxPh-N  = 1000 A.
In other words, that means the TF winding impedance is Xt = (11000/√3) / 1000 = 6.35 Ω

We can now consider the maximum fault current on the LV side for single phase to earth vs phase-to-phase faults.

We can see that a phase-to-phase fault has a lower maximum fault current:

IfmaxPh-Ph = 11000 / (2 x 6.35)  =  866 A.

Hence for a phase-to-phase fault, the LV side inverse time relay will operate slower than for a single phase to earth fault at the same location.

We can now consider these two fault scenarios reflected onto the HV side

1-phase faults on LV

As well as satisfying volt/turn balance on the windings, all transformers also have to satisfy ampere.turn balance.

For a single phase ot earth fault we can therefore calculate the current in the one winding of the HV delta

AHVwinding x THV   =   ALVwinding x TLV

AHVwinding = ALVwinding x TLV / THV

                   = 1000 x 500 / 866

                   = 577 A

Now because there is no current in two of the delta windings, the current in the other winding can only come from and go to the two lines connected to the end of that winding. 
Hence this is seen as a phase-to-phase fault by the protection on the lines.
The current distribution on the HV lines is 1-1-0, i.e. two phase have equal and opposite 577 A.

The grading margin is now between the operating time of the LV relay at 1000 A compared to the operating time of the HV relay at 577 A, which is of course much slower operating time with the lower current.

Ph-Ph fault on the LV

We must also consider the effect of a phase-to-phase fault on the LV and the respective currents seen on the HV.

As shown above, the maximum LV fault current for a phase-to-phase fault is √3/2 x maximum 1-ph fault, i.e. 866 A.

There are two LV windings involved in the LV fault, therefore two windings of the delta must be carrying current according to ampere.turns balance.

AHVwinding = ALVwinding x TLV / THV

                   = 866 x 500 / 866

                   = 500 A

Now consider where the delta winding currents come from and goes to.  

We know that the two LV winding currents are equal and opposite.
Hence the HV winding currents must be equal and opposite.

Hence on two phases, the two line currents equals the winding current.

Whilst on the third phase, the total current is twice the winding current.

Hence for a 866 A phase-to-phase fault on the LV, the HV line current is 500 A on two phases, and 1000 A on the third, so the grading is between 866 A LV and 1000 A HV ..

i.e. the LV inverse relay is operating slower than for a single phase LV fault (866 A c.f. 1000 A) whilst the HV is much faster than for a single phase LV fault (1000 A c.f. 577 A)






Course contact
Are you in need of specific training:
  • Protection Systems Engineering
  • IEC 61850 Engineering

I provide a range of courses for company-specific in-house training and occasional public invitation courses.  Contact me for details.


 

Contact Me

Email Me

A phone call is nearly always welcome depending on the time of night wherever I am in the world.
Based in Adelaide UTC +9:30 hours e.g.

April-SeptemberNoon UK = 2030 Adelaide
October-March:Noon UK = 2230 Adelaide

  Office + 61 8 7127 6357
  Mobile + 61 419 845 253


Extra Notes:

Disclaimer
No Liability:
Rod Hughes Consulting Pty Ltd accepts no direct nor consequential liability in any manner whatsoever to any party whosoever who may rely on or reference the information contained in these pages.  Information contained in these pages is provided as general reference only without any specific relevance to any particular intended or actual reference to or use of this information. Any person or organisation making reference to or use of this information is at their sole responsibility under their own skill and judgement.

No Waiver, No Licence:
This page is protected by Copyright ©
Beyond referring to the web link of the material and w
hilst the information herein is accessible "via the web", Rod Hughes Consulting Pty Ltd grants no waiver of Copyright nor grants any licence to any extent  to any party in relation to this information for use, copy, storing or redistribution of this material in any form in whole or in part without written consent of Rod Hughes Consulting Pty Ltd.