Smart Meters with IEC 61850

© Copyright Rod Hughes Consulting Pty Ltd
Rod Hughes Consulting
General Web Site
 
Applications
Home
Innovations and
Solutions Home

A bit about
Rod Hughes
 Link to this page...

The URL in the browser address bar is volatile and may be broken at any time.

To obtain a link to this page, click the <<Share>> button top-right of the screen.

  

Note - if the navigation pane on the left of this window is not visible, click the 2-pane icon on the top bar



At the consumer end there is a lot of talk in Smart Grid circles about home automation systems with the meter as the node, however the role of the energy meter doesn't change as far as measuring I, V and F and giving W, Var, VA and PF.

In terms of implementing IEC 61850 from the user or the meter vendor's perspectives, the application and need is vital to know.

General Metering Requirements

Metering related data structure are defined in the IEC 61850 7-4 Logical Nodes M Group - Measurement Functions

 Click here to expand list of M Group LNs ...

Error rendering macro 'excerpt-include' : No link could be created for 'M Group - Measurement Functions'.

That satisfies the simple statement of complying to a 7-4 Data Model.

In principle, it would still be possible to talk to that device with say DNP3 or Modbus if it maps info into a point based listing - a huge a waste since all the semantics for engineering and other applications are lost.

IEC 61850 is about structuring and configuring communication between devices and between functions, hence defined semantics that are used and understood from top to bottom, left to right. Even just domestic meters for billing can do with all meters having the same semantics and data structure across all vendors.

We are even seeing now Data Models for Electric Vehicles, Distributed Energy Resources, PV, Battery, Microturbines, Fuel cells – and metering is involved with all these.

There is an impressive array of functionality with structured information for Harmonic Power Quality, Schedules, Pricing, Statistical and Historical analysis with interval, periodic and sliding calculations

Not only do we need the data structure but also the communication services.

The famous GOOSE is probably not a key requirement for meter applications - GOOSE is for extremely fast communication of status changes for real time (<10milliesecond) automation. However the Reporting mechanisms and the ACSI command language for GetValues etc are essential for this 'upstream' application for Smart Grid.

Substation Metering

The last element for applying IEC 61850 in metering is more applicable to the substation applications where there is a huge issue of the engineering effort to specify, design and implement the hundreds of cables per feeder purely associated with CT and VT wiring.

These wires can all be replaced with one optical fibre running past all the bays saving thousands of wires and associated engineering.

This can be achieved with conventional CT and VT using Stand Alone Merging Units such as available from Schniewindt (ask me for a quote) which give Sampled Value IEC 61850 9-2 or 9-2LE messages to the meter.

Moreover where utilities are seeking to eliminate CT explosions, eliminate saturation, extend dynamic range, reduce number from five or six cores per feeder to just two (main and backup), and many other benefits...... the move to Low Power Instrument Transformers is growing rapidly. (LPIT: previously referred to as Non-Conventional Instrument Transformers are now becoming seen as ‘conventional technology’, hence the acronym change).

LPIT use optical measurement (to name just a couple of examples) are available from ALSTOM Grid or Smart Digital Optics (sold via Arteche) or the Rogowski coil based technology. These may have been a bit slow to be implemented to date but I would suggest simply because of supposed perceived lack of experience and confidence – the fact is optical CTs have been in service since 1984 and proprietary sampled value formats, even IEC60044-8, have been in use in numerical bus bar protection since the 1990’s.

Whilst an MMXU Logical Node would satisfy the output data flow requirements to the upstream SCADA and billing etc using Part 8-1 comms, we also need the meter to accept Part 9-2 Sampled Value inputs via a comms port from a 1A/110V Merging Unit or an LPIT Merging Unit with TCTR Logical Nodes providing the Sampled Value streams.

Here in Australia we already have utilities wanting to buy IEC 61850 9-2 input meters for their substations simply because they want to get rid of the thousands of CT/VT wires for one optical fibre and then have one common communication system talking between the meters, relays, condition monitors, controllers and the SCADA system.

 

Contact Me

Email Me

A phone call is nearly always welcome depending on the time of night wherever I am in the world.
Based in Adelaide UTC +9:30 hours e.g.

April-SeptemberNoon UK = 2030 Adelaide
October-March:Noon UK = 2230 Adelaide

  Office + 61 8 7127 6357
  Mobile + 61 419 845 253



Extra Notes:

Disclaimer
No Liability:
Rod Hughes Consulting Pty Ltd accepts no direct nor consequential liability in any manner whatsoever to any party whosoever who may rely on or reference the information contained in these pages.  Information contained in these pages is provided as general reference only without any specific relevance to any particular intended or actual reference to or use of this information. Any person or organisation making reference to or use of this information is at their sole responsibility under their own skill and judgement.

No Waiver, No Licence:
This page is protected by Copyright ©
Beyond referring to the web link of the material and w
hilst the information herein is accessible "via the web", Rod Hughes Consulting Pty Ltd grants no waiver of Copyright nor grants any licence to any extent  to any party in relation to this information for use, copy, storing or redistribution of this material in any form in whole or in part without written consent of Rod Hughes Consulting Pty Ltd.