Medium voltage bus bar protection is often implemented using Reverse Blocking so called "Reverse Blocking" where the start element of the outgoing feeders is used to block the instantaneous element of the incomer and bus section.

This is an IDEAL application for GOOSE.
Each downstream PTOC.Str is published on the LAN
The upstream and bus section IED's would subscribe to all those messages and use them for their PTOC.BlkRef
i.e. if any downstream PTOC.Str = true, then the upstream PTOC is blocked.

Note the bus section would need directional controlled PTOC so you have to block the correct direction.

Expected time: if there is a bus fault the downstream PTOC.Str are all False so there is no blocking of the upstream PTOC. The upstream PTOC will operate in whatever time they are configured for (probably a short time delay to make sure there is no "race" between the downstream feeder relays and the upstream for a fault on the feeder)

  It is also wise to then should consider CIrcuit Breaker Failure with the use of RBRF so that an uncleared feeder fault will still result in clearance by the upstream relays.

As in all these things, also give consideration as to how you implement the GOOSE message subscriptions so that you minimise or preferable eliminate the need to reconfigure existing devices when bays are added in the future.


Normally with no fault anywhere, the feeders are each publishing their individual GOOSE with PTOC=False ,
i.e. suppose there are 10 outgoing feeders.
There are therefore 10 individual GOOSE messages each containing a bit that represents
Fdr1PTOC.Str=False
Fdr2PTOC.Str=False
Fdr3PTOC.Str=False
...
Fdr10PTOC.Str=False
These 10 messages are repeated every 1 second.

The incomer and the bus section are the Subscribers.
Each subscribes to the 10 GOOSE messages. They are configured as I said before that any of the received GOOSE change to PTOC.Str=True will BLOCK the incomer and the bus section.

Hence if there is a Fault on Feeder 3, the Published Goose messages will be
Fdr1PTOC.Str=False
Fdr2PTOC.Str=False
Fdr3PTOC.Str=TRUE
...
Fdr10PTOC.Str=False
Hence the incomer and the bus section will not trip because of the one GOOSE message containing True.
Feeder 3 will still operate to clear the fault on the feeder.

If there is a bus fault, the outgoers will still all be publishing False since they are not seeing any fault current flowing out onto the Feeders i.e. PTOC.Str=False.

Therefore the incomer and the bus section subscribing to all 10 messages don't receive any with a bit =True, they do not block and so they can trip according to their operating settings - pickup, curve and time delay.

 

Contact Me

Email Me

A phone call is nearly always welcome depending on the time of night wherever I am in the world.
Based in Adelaide UTC +9:30 hours e.g.

April-SeptemberNoon UK = 2030 Adelaide
October-March:Noon UK = 2230 Adelaide

  Office + 61 8 7127 6357
  Mobile + 61 419 845 253



Extra Notes:

Disclaimer
No Liability:
Rod Hughes Consulting Pty Ltd accepts no direct nor consequential liability in any manner whatsoever to any party whosoever who may rely on or reference the information contained in these pages.  Information contained in these pages is provided as general reference only without any specific relevance to any particular intended or actual reference to or use of this information. Any person or organisation making reference to or use of this information is at their sole responsibility under their own skill and judgement.

No Waiver, No Licence:
This page is protected by Copyright ©
Beyond referring to the web link of the material and w
hilst the information herein is accessible "via the web", Rod Hughes Consulting Pty Ltd grants no waiver of Copyright nor grants any licence to any extent  to any party in relation to this information for use, copy, storing or redistribution of this material in any form in whole or in part without written consent of Rod Hughes Consulting Pty Ltd.