Year | Title | Event/Publication | Written Paper | Slide Presentation | Comments |
---|
2020 | Optimising LAN Architecture For Improved Reliability And Resilience | CIGRE 2020 SC B5 Paper B5-214 | RH44D |
|
|
2018 | CIGRE SC B5 Contributions to Preferential Subject 2 | Paris Session | RH40D RH41D RH42D RH43D | RH40P RH41P RH42P RH43P | Resilient LAN B5_PS2_Q1 Time Synch B5_PS2_Q3 DUT B5_PS2_Q6 Audit B5_PS2_Q8 |
2017 | Changing our View Of The World | Key Note Speech CIGRE Brazil International Seminar on Policies, Incentives, Technology and Regulation of Smart Grids |
| RH39P |
|
2017 | 12 years of history of IEC 61850 .. and plenty more to come
| T&D Magazine Feb 2017 | RH38D Part 1 RH38D Part 2 |
|
|
2017 | Experiences And Requirements For Commissioning, Troubleshooting And Maintenance Of IEC 61850 Stations | CIGRE SC B5 Auckland | RH37D |
|
|
2017 | Quality Assurance requirements and experiences for GOOSE/SV configuration | CIGRE SC B5 Auckland | RH36D |
|
|
2017 | Quality Assurance requirements and experiences for GOOSE/SV configuration | CIGRE AU SEAPAC | RH35D | RH35P |
|
2016 | State Of The Art of Asset Condition Monitoring Systems With IEC 61850 | T&D Magazine Dec 2016 | RH34D |
|
|
2016 | Completing the IEC 61850 substation – the need for metering | CIGRE SCB3 2016 Paper 214 | RH33D |
|
|
2015 | NERC CIP – not Australian Law, but the benchmark for Cybersecurity | Australian Utility Week |
| RH32P |
|
2015 | Applying the right IEEE 1588 clock to achieve Sampled Value and Synchrophasor performance | CIGRE SEAPAC 2015 | RH31D | RH31P |
|
2015 | Requirements and Experience of Practical Secure Access Control and Management of Intelligent Systems | CIGRE SEAPAC 2015 | RH30D | RH30P |
|
2014 | Requirements and Experience of Practical Secure Access Control and Management of Intelligent Systems | Australian Utility Week |
| RH29P |
|
2014 | Requirements and Experience of Practical Secure Access Control and Management of Intelligent Systems | EEA NZ | RH28D |
|
|
2013 | Finding your GOOSE in the Substation | Australian Utility Week |
| RH27P |
|
2013 | Optimisation of CT/VT Arrangements and Improved Operational Response | CIGRE SC B3 2013 Colloquium |
| RH26P |
|
2013 | Avoiding ENTSO-E Experiences in IEC 61850 deployment (40 minutes) | Smart Substations 2013 |
| RH25P |
|
2013 | IEC 61850 – Is it for Protection or for SCADA Engineers? | Smart Substations 2013 |
| RH24P |
|
2013 | Avoiding ENTSO-E Experiences in IEC 61850 deployment (15 minutes)
| CIGRE SEAPAC 2013 |
| RH23P |
|
2013 | Limitations of Applying IEC 61850 | CIGRE SEAPAC 2013 |
| RH22P |
|
2013 | International Substation Automation and Smart Grid Developments | API Summer School | not publicly available |
|
|
2013 | Technologies for Engineering the Smart Grid | API Summer School | not publicly available |
|
|
2012 | “5-minute” System Restoration Using Remote Access and IEC 61850 | CIGRE_2012_B3_PS1_03 | RH19D | RH19P | - eliminating physical I/O - digital and analogue to all relays - that is station bus and process bus -
- protection IEDs: IEC 61850-9-2 IEDS
- eliminate the CT/VT wiring SAMU for existing CT/VT
- eliminate the primary plant I/O to CB etc switchgear interface
- providing a secure access unit for the technician to be able to be used securely from any PC or hand held device secure remote access system
|
2012 | Remote Access Solutions for IED Management | CIGRE_2012_B5_PS2_04 | RH18D | RH18P | providing a secure access unit for the technician to be able to be used securely from any PC or hand held device secure remote access system |
2012 | System Restoration with IEC 61850 | CIGRE_2012_B5_PS2_06 | RH17D | RH17P | eliminating physical I/O - digital and analogue to all relays - that is station bus and process bus -
- protection IEDs: IEC 61850-9-2 IEDS
- eliminate the CT/VT wiring SAMU for existing CT/VT
- eliminate the primary plant I/O to CB etc switchgear interface
|
2012 | State Of The Art Asset Condition Monitoring Systems with IEC 61850 | Techcon | RH16D | RH16P |
|
2011 | Choosing and using IEC 61850 SCL files, process and tools correctly throughout the complete SAS lifecycle | CIGRE SC B5 Lausanne | RH15D |
| vendor-independant engineering tool
|
2011 | Experiences of IEC 61850 Engineering – Designing good systems the right way. | SEAPAC | RH14D | RH14P | vendor-independant engineering tool Operator and Test Interface |
2011 | IEC 61850 Edition 2 – what does it mean for the end user? | SEAPAC | RH13D | RH13P | Operator and Test Interface |
2011 | Experiences in organisational development and specifying IEC 61850 systems | SEAPAC | RH12D | RH12P | vendor-independant engineering tool |
2010 | From wires to datasets Case studies on Australian utilities organisation migration to IEC 61850 | PAC World | RH11D | RH11P |
|
2010 | What is IEC 61850 | T&D magazine | RH10D |
|
|
2010 | Unlocking the real benefits of IEC 61850 | T&D magazine | RH09D |
|
|
2009 | More, Faster, Less, Less - The Business Drivers for IEC 61850 | iKnowledge |
| RH08P |
|
2009 | Engineering Process for IEC 61850 | iKnowledge |
| RH07P |
|
2009 | More, Faster, Less, Less the business drivers for IEC 61850 | SEAPAC | RH06D | RH06P |
|
2009 | Engineering Process for IEC 61850 | SEAPAC | RH05D | RH05P |
|
2009 | Considering the Process Bus | SEAPAC | RH04D | RH04P | - protection IEDs: IEC 61850-9-2 IEDS
- eliminate the CT/VT wiring SAMU for existing CT/VT
- eliminate the primary plant I/O to CB etc switchgear interface
|
2007 | Establishing Sufficient Redundancy: Protection & Telecommunication | CIGRE Paris | RH03D |
|
|
2007 | Establishing Sufficient Redundancy: Protection & Telecommunication | SEAPAC | RH02D | RH02P |
|
2007 | Utility Wide Migration to IEC61850 | SEAPAC | RH01D | RH01P |
|