Reference | Type | Current | Old | Title |
---|
IEC 61850-1 | TR | 2013 | 2003 | Introduction and overview |
IEC 61850-1-2 | TR | 2020 |
| Guideline on extending IEC 61850 |
IEC 61850-2 | TS | 2019 | 2003 | Glossary |
IEC 61850-3 | IS | 2013 | 2002 | General requirements |
IEC 61850-4 | IS | 2011 | 2002 | System and project management |
IEC 61850-5 | IS | 2013 | 2003 | Communication requirements for functions and device models |
IEC 61850-6 | IS | 2018 | 2009 2004 | Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-6-1 |
|
|
|
|
IEC 61850-6-2 |
|
|
| Configuration description language for extensions for human machine interfaces |
IEC 61850-6-100 |
|
|
| SCL Function Modelling for Substation Automation |
IEC 61850-7-1 Ed2 AMD1 IEC 61850-7-1 Ed2.1 | IS IS IS | 2011 2020 2020 | 2003 | Basic communication structure - Principles and models |
IEC 61850-7-2 Ed2 AMD1 IEC 61850-7-2 Ed2.1 | IS IS CSV | 2019 2020 2020 | 2010, 2003 | Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-7-3 Ed2 AMD1 IEC 61850-7-3 Ed2.1 | IS IS CSV | 2019 2020 2020 | 2010, 2003 | Basic communication structure - Common data classes |
IEC 61850-7-4 Ed2 AMD1 IEC 61850-7-4 Ed2.1 | IS IS CSV | 2019 2020 2020 | 2010, 2003 | Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-5 |
|
|
| IEC 61850 modelling concepts |
IEC 61850-7-6 | TS | 2019 |
| Guideline for definition of Basic Application Profiles (BAPs) using IEC 61850 |
IEC 61850-7-7 | TS | 2018 |
| Basic communication structure - Machine-processable format of IEC 61850-related data models for tools |
IEC 61850-7-99 |
|
|
|
|
IEC 61850-7-410 |
| 2015 | 2012, 2007 | Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61850-7-420 | IS | 2009 |
| Basic communication structure - Distributed energy resources logical nodes |
IEC 61850-7-499 |
|
|
|
|
IEC 61850-7-500 | TR | 2017 |
| Basic information and communication structure - Use of logical nodes for modelling application functions and related concepts and guidelines for substations |
IEC 61850-7-510 | TR | 2012 |
| Hydroelectric power plants - Modelling concepts and guidelines |
IEC 61850-7-520 |
|
|
| DER - Modelling concepts and guidelines |
IEC 61850-8-1 | IS | 2020 | 2011 2004 | Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-8-2 | IS | 2018 |
| Specific communication service mapping (SCSM) - Mapping to Extensible Messaging Presence Protocol (XMPP) |
IEC 61850-9-1 |
| withdrawn | 2003 | Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
IEC 61850-9-2 | IS | 2020 | 2011 2004 | Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
"IEC 61850-9-2LE" | UCAIUG | refer IEC 61860-9 | 2007, 2001 | UCAIUG's Interim Guideline for application of IEC 61850-9-2 for CT/VT applications. Replaced by IEC 61869-9 |
IEC 61850-9-3 | IS | 2016 |
| Precision time protocol profile for power utility automation (IEEE 1588) |
IEC 61850-10 | IS | 2012 | 2005 | Conformance testing |
IEC 61850-10-3 |
|
|
| Functional testing of IEC 61850 based systems |
IEC 61850-80-1 | TS | 2016 | 2008 | Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
IEC 61850-80-2 | TS |
|
| Mapping to DNP3 IEEE Standard 1815.1 IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)] |
IEC 61850-80-3 | TR | 2015 |
| Mapping to web protocols - Requirements and technical choices |
IEC 61850-80-4 | TS | 2016 |
| Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model |
IEC 61850-80-5 | TS |
|
| Guideline for mapping information between IEC 61850 and IEC 61158-6 (Modbus) |
IEC 61850-80-6 |
|
|
| Using IEC 61850 for communication between substations and control centres |
IEC 61850-80-7 |
|
|
| Communication services and data model to support IEC 61850 system management |
IEC 61850-90-1 | TR | 2010 |
| Use of IEC 61850 for the communication between substations |
IEC 61850-90-2 | TR | 2016 |
| Using IEC 61850 for communication between substations and control centres |
IEC 61850-90-3 | TR | 2016 |
| Using IEC 61850 for condition monitoring diagnosis and analysis |
IEC 61850-90-4 | TR | 2020 | 2013 | Network engineering guidelines |
IEC 61850-90-6 | TR |
|
| Use of IEC 61850 for Distribution Automation Systems |
IEC 61850-90-5 | TR | 2012 |
| Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEC 61850-90-6 | TR | 2018 |
| Use of IEC 61850 for Distribution Automation Systems |
IEC 61850-90-7 | TR | 2013 |
| Object models for power converters in distributed energy resources (DER) systems |
IEC 61850-90-8 | TR | 2016 |
| Object model for E-mobility |
IEC 61850-90-9 | TR | 2020 |
| Object models for electrical storage systems |
IEC 61850-90-10 | TR | 2017 |
| Models for scheduling |
IEC 61850-90-11 | TR | 2020 |
| Methodologies for modelling of logics for IEC 61850 based applications |
IEC 61850-90-12 | TR | 2020 | 2015 | Wide area network engineering guidelines |
IEC 61850-90-13 | TR |
|
| Deterministic networking technologies |
IEC 61850-90-14 | TR |
|
| Using IEC 61850 for FACTS and power conversion data modelling |
IEC 61850-90-15 | TR |
|
| DER Grid Integration |
IEC 61850-90-16 | TR | 2021 |
| Requirements of system management for Smart Energy Automation |
IEC 61850-90-17 | TR | 2017 |
| Using IEC 61850 to transmit power quality data |
IEC 61850-90-18 |
|
|
| Modelling alarm handling for IEC 61850 |
IEC 61850-90-19 | TR |
|
| Applying Role Based Access Control (RBAC) to IEC 61850 |
IEC 61850-90-20 | TR |
|
| Guideline for redundant IEDs with IEC 61850 |
IEC 61850-90-21 |
|
|
| Use of IEC 61850 for travelling wave fault location system |
IEC 61850-90-22 | TR |
|
| SCD based substation network auto-routing with visualization and supervision support |
IEC 61850-90-23 |
|
|
| Model extensions to IEC 61850 to support microgrids |
IEC 61850-90-24 |
|
|
| Mapping of IEC 62351-7 on IEC 61850 |
IEC 61850-90-25 |
|
|
| Model update based on Users feedback |
IEC 61850-90-26 |
|
|
| IED Specification Description |
IEC 61850-90-27 |
|
|
| Use of IEC 61850 for thermal energy systems connected to electric power grid |
IEC 61850-99-99 | TR |
|
| Communication network in hydropower plants |